back
Chamber: Single
More suitable alternative: NO
Produces heat: NO
Produces Static: NO
Low Flash point: NO
Produces Fuel: NO
Produces Adverse: NO
Produces Mechanical: NO
See table below to understand risk level corresponding to each risk score.
Risk Score Risk Level Risk Description
> 100 5 Extremely dangerous: do not operate facility
50 - 100 4 Very high: stop use of equipment, processs or procedure
20 - 50 3 High: required urgent attention; proceed with care
5 - 20 2 Medium: attention needed but operation may continue
< 5 1 Low: acceptable risk but noted
* Burman F. Risk Assessment Guide for Installation and Operation of Clinical Hyperbaric Facilities. San Antonio, Texas: International ATMO; 6th Edition, 2019. ISBN: 978-0-578-22098-7

Created 7/16/2024 4:15:38 PM by lauren johnston   bandaid.pdf
t
-->